Carbon Wise Projects

Read about the energy-efficient, low-carbon projects Carbon Wise has worked on.

Nelson Fire Hall

Carbon Wise explored cost and embodied carbon outcomes for a new fire hall by comparing two structural design approaches.

Through whole-building Life Cycle Assessment and cost analysis, we conducted a comparative life cycle and cost study of timber versus concrete designs, revealing how design integration and delivery strategy shaped cost and embodied carbon outcomes more than material choice alone.

Key Takeaways

N

Material choice alone did not determine cost or carbon outcomes

N

Timber showed lower carbon intensity in core life cycle stages, but its advantage varied widely depending on modeling assumptions

N

Cost and embodied carbon responded to different drivers and did not move together

N

System integration mattered more than whether the structure was timber or concrete

LCA Cambie Street

Pin It on Pinterest